PCS for Energy time shift and peak shaving(GP-3000)
1.Data sheet
GP-3000(One-line Diagram)
2. ESS applied cases
1) ESS for solar power plant
Configurationof ESS for solar power plant
2) ESS for MICRO-GRID system
Off-grid MICRO-GRID System configuration
Micro-Grid System installed in JIDO (island)
3.Track records of PCS for Peak control
2017 500kW PCS, Taekwang second Factory (Nuri Telecom)
2017 250kW PCS, Castech Korea (Omni System)
2017 500kW PCS, PacificGlass (Seochang Electric Communication)
2017 250kW PCS, Poongki Industry (KT)
2017 250kW PCS, Eldorado Resort (KT)
2017 250kW PCS, Kolmar Korea (KT)
2017 500kW PCS, Dong Eun Forging (Omni System)
2016 250kW PCS, KDN Head Office in Naju, 2Sets
2016 500kW PCS, Taekwang Factory (Nuri Telecom)
2016 1MW PCS, Bokwang Industry (Nexchal)
2016 250kW PCS, Dong WonF&B (VASCOI City)
2016 250kW PCS, New Mold (LG U PLUS)
2015 1MW PCS, Pulmuone in Eumseong (Naracontrols)
2015 500kWPCS, Dongil-Steelin Anseong (Nexchal)
2015 500kW PCS, LS Metalin Janghang (Seochang Electric Communication)
2014 1MW PCS, Daeduck in Siheung (S1)
2013 150kW PCS, KEPCO KDN in Daejeon Chungnam (KEPCO KDN)
2012 kW PCS, Gwangju Techno park (Korea Electric Power Industrial- Development)